Supply Chain Planning and MES integration improves efficiency and reduces uncertainty.
Accurate, timely data drives efficient planning, but many manufacturers find themselves limited by traditional practices.
For decades, planning teams used data from ERP systems that was designed for financial analysis.
Yet, as the business landscape evolves at an unprecedented pace, it has become imperative for leaders to question the efficacy of these longstanding practices.
Outdated Practices
Why are so many manufacturers reliant on outdated methodologies like standard costing, run rates and material usage that use accruals to account for variances in financial results?
This practice undermines the accuracy of financial analysis, while hindering the supply chain’s ability to swiftly respond to market fluctuations and disruptions.
These antiquated practices lack accuracy and fail to provide the real-time visibility required to make informed decisions.
In an era where agility and adaptability are paramount, clinging to conventional approaches may prove detrimental to a company's competitive edge. It’s time to break free from legacy systems that hamper progress and take a leap forward.
Disconnects Between MES and Executive Decision-Makers
The disconnect between Manufacturing Execution Systems (MES) and executive-level decision-makers further compounds these challenges. Despite the wealth of data generated by MES, the failure to integrate and analyze this information into strategic decision-making processes creates inefficiencies and missed opportunities across the supply chain.
These conventional practices have given rise to various common challenges that cost money and impact customer fill rates due to poor schedule adherence, unexpected changeovers and production delays, driven from:
Limited visibility into Raw Material issues. Often, companies struggle to track the availability of raw materials in real-time, leading to delays and disruptions in production schedules. This lack of visibility impacts operational efficiency and increases the risk of missed delivery deadlines and customer dissatisfaction. For example, a raw material issue, such as receiving the wrong material or experiencing quality issues, can halt production lines and impact overall productivity. Furthermore, raw materials are sometimes stored or managed outside of the shop floor, complicating inventory management processes, especially when raw materials are in-transit or stored at supplier locations. This decentralized approach to raw material handling can result in inefficiencies, as operations teams may struggle to access critical materials when needed.
Limited connectivity between planning and operations teams. In many organizations, these two functions operate in silos, leading to misalignment and communication gaps. When there is a connection, it’s often a one-way street with supply chain pulling data from MES when it should be a bi-directional flow of information. When delays occur in execution, there is no option to quickly reassess the situation and respond via connected data, decision-making, and operations. Additionally, nuances in efficiencies and capacity are not accurately represented in strategic decision-making.
Unfeasible master production schedules. Production plans may not accurately reflect operational realities, leading to unfeasible master production schedules. Using standards from ERP for production run-rates and material consumption can cause significant variances between the labor, machine hours and materials planned and what is needed on the shop floor. Unplanned downtimes due to changeovers, raw material shortages, and production line disruptions represent another critical challenge for manufacturers. These downtime events can occur unexpectedly, causing delays and interruptions to schedules that lead to unsatisfied customers.
Inefficiencies due to limited visibility into existing capacity. While MES provides production rate data, there's often no direct feedback to planning systems, leading to inaccurate capacity assessments and manufacturers struggling to optimize production schedules. Relying solely on ERP for capacity information is insufficient, as these systems may not capture all relevant data, resulting in discrepancies between planned and actual capacity. An effective integration of MES and planning with real-time exchange of data is crucial for accurate capacity assessments and agile decision-making.
The Digital Thread
The integrated connection between John Galt Solutions’ Atlas Planning Platform and Velotic’s Proficy Smart Factory MES establishes a powerful digital thread that spans customer value chains. This digital thread can represent a real-time integration that can both connect disparate data sources and enable advanced analytics and machine learning algorithms to help derive actionable insights. The power of this bi-directional connectivity can enable companies to transcend the limitations of traditional accounting-centric approaches and drive better outcomes, primarily:
- 增強可視性、效率和排程達成率。Velotic/John Galt 數位主線為擴展供應鏈的各個方麵(例如原材料采購和製造現場)提供了更好的可視性。借助實時數據,整個業務的團隊能夠做出更明智的決策,例如關於原材料採購和分配的決策,這有助於確保在需要時以及在供應鏈的哪個節點都能獲得正確數量的原材料。這種改進的可視性可以轉化為更高的效率以及更好地按承諾滿足訂單的能力,從而提高客戶滿意度。
- 通過準確反映生產實際情況來提高排程依從性。規劃和 MES 之間的無縫溝通意味著企業可以擁有更緊密對齊的生產排程,從而反映營運能力。現在,我們有可能達到新的生產水平,同時最大限度地減少中斷。增強的排程依從性可以提高產量和成本效益,同時顯著提升服務水平。
減少不確定性和波動性
許多企業麵臨的一個重大挑戰是其生產環境中固有的不確定性和波動性。現在,利用從該數位主線中獲得的見解,企業可以更好地預測和管理中斷。例如,通過分析有關計劃變更和中斷的曆史數據,企業可以主動調整其計劃以應對不可預見的事件——最大限度地減少中斷的影響,同時增強韌性。
數位主線使企業能夠透過識別改進領域來優化其規劃流程。了解計劃變更的頻率和幅度有助於製定更具彈性、能夠承受中斷的計劃。這是規劃方麵的一大進步,為團隊賦予了更有效地駕馭現代供應鏈複雜性並保持競爭優勢的能力。
以整體方法重新思考規劃
Atlas Planning Platform 與 Velotic 的 Proficy Smart Factory MES 的集成,使企業能夠憑藉實時可視性、高級分析和強大見解來釋放供應鏈的全部潛力,從而做出更好的決策。隨著企業不斷發展並適應不斷變化的市場動態,數位主線可以成為創新和盈利增長的基石。
重新思考規劃流程,不再依賴 ERP 係統中陳舊的標準數據,這些數據在當今快節奏且動態的商業環境中已不再適用。
相反,企業必須轉向利用準確、及時且相關的數據。安排演示以探索如何創建一個將不同的數據源和營運連接起來的有凝聚力的數位主線,從而在整個生態係統中做出更好的決策,使您的團隊能夠有效地預測並適應中斷。
MES 與供應鏈規劃集成的強大功能可以加速整個組織的價值並縮短決策延遲。進一步了解 Velotic 的 Proficy Smart Factory MES 和 John Galt Solutions 的 Atlas Planning Platform。
作者
繼續閱讀
部落格
-
系統整合商如何協助製造商建構互聯且具備數據就緒能力的營運
了解工業系統整合商如何協助製造商連接 IT 與 OT 系統、提高數據就緒能力,並建構可規模化的營運架構。
部落格 -
數據準備度差距:為什麼製造商難以發揮 AI 的價值
為什麼製造商難以從 AI 中獲得價值?探討阻礙他們的數據準備度挑戰,以及營運脈絡如何支援更好的決策。
部落格 -
製造業現代化專案為何停滯不前,以及如何推動其向前發展
製造業現代化專案為何停滯?探討常見的數位轉型挑戰,以及如何調和技術、人員和業務成果。
部落格 -
AI 在報警管理中的應用:AI 如何改變 HMI SCADA
了解 AI 與報警分析如何協助工程團隊減少報警過載、發掘模式、調查根本原因,並改善 HMI SCADA 報警管理。
部落格 -
讓隱形的工廠工作變得透明:Velotic 與 Data Time Space 將實體作業連接至 ThingWorx
將實體活動轉化為可用的工業數據,透過 Kepware 進行連接,並為 ThingWorx 提供新的上下文,以實現運營洞察和改進。
部落格 -
Velotic 展望未來:AI 進入 SCADA、歷史數據庫與數位工廠的核心
Novotek Italy 探討 Velotic 的 AI 如何透過智慧報警、AI 代理等技術,轉型 SCADA、歷史數據庫與工業軟體。
部落格 -
超可擴展性不只是儲存更多資料,而是讓工業資料在整個企業中變得可存取、具備關聯性且隨時可供人工智慧使用。
部落格 -
重新思考製造執行系統部署:雲端與地端之成本、風險及總擁有成本(TCO)解析
部落格 -
隆重介紹 Velotic:開創工業軟體的未來(結合自 GE Vernova Proficy、PTC ThingWorx 與 Kepware)
Velotic 是一家全新的獨立工業軟體公司,由 GE Vernova 的 Proficy 與 PTC 的 ThingWorx 和 Kepware 合併而成。
部落格 -
釋放食品與飲料及 CPG 的策略潛力:雲端轉型後重新部署 IT 資源
釋放食品與飲料及 CPG 的策略潛力:雲端轉型後重新部署 IT 資源
部落格