JP Air Tech ApS produces air filters for the automotive and cabin industries, and for the pharmaceutical and food industries. The company has more than 30 years of experience in filtration, and has an export portfolio spanning more than 50 countries.
In 2021, JP Air Tech decided to switch to digital production scheduling, and they chose Proficy Scheduler as their new production scheduling system. They lacked an overview of production and needed to minimise the massive amount of time spent on updating manual scheduling systems. These challenges are something that Proficy Scheduler is particularly well-equipped to solve. It was an easy decision for the Danish production company to go with Proficy Scheduler.
"Before Proficy Scheduler, we could fall behind schedule simply because we forgot about orders or were simply unable to find them. We really lacked an overview in production, but also in our scheduling. We spent an inordinate amount of time on constantly updating, and still, we could simply misplace or forget about an order. This does not happen anymore. Actually, the problem vanished the minute we started using Proficy Scheduler. Today, we can’t do without Proficy Scheduler. It’s simply become an indispensable tool that has an integral role in the way that our systems have been set up now. Everything is managed via Proficy Scheduler. Orders are set up in NAV and then exported to Proficy Scheduler. All operators have access to Proficy Scheduler and they’re able to see their assigned jobs. They use Proficy Scheduler Shopfloor, for instance, to keep track of what their next job is.” – Dick Liisborg, Production Assistant at JP Air Tech.
Results from improved production scheduling:
- Increased production overview
- Smooth and steady production
- Improved order flow
- Less time spent updating orders
- Easier navigation of unplanned changes