The OTO2 production plant is one of Lek’s largest production sites in Slovenia, with specialized high-technology process equipment for producing generic drugs. Key product groups include antibiotics, treatments for central nervous system disorders, gastrointestinal medicines, cardiovascular treatments, and hormone therapies. Plant OTO2 follows high standards of sterility, safety, and quality to meet strict FDA approvals.
The production of pharmaceutical products requires specialized and controlled environments, where sterile conditions have to be maintained. Therefore, heating, ventilation, and air-conditioning systems (HVAC) are necessary for controlling these environments. A control system for HVAC is a critical factor, which affects the reliability of analysis results, experiments, and production systems. One of its most critical tasks is to prevent outside air from entering the facility. Therefore, Lek required a validated and highly reliable building management system and environmental monitoring system (BMS/EMS) solution for HVAC control and supervision to provide precise, critical control of temperature, humidity levels, and airflow patterns.
The solution needed to provide complete remote control of all HVAC systems, automatic adjustment of process parameters according to production demands, alarm management, efficient visualization, and trending, together with process data archiving and reporting. It was also integral that the solution enabled fully controlled conditions in OTO2 to enable effective production and energy management, increase the level of quality control, as well as increase flexibility and production adaptation to new demands. Since plant and all production facilities have been designed according to GAMP1 recommendations, the company’s HVAC solution had to meet respective pharmaceutical regulatory requirements and recommendations.